Four of the group’s six production sites now run on closed-loop water recovery systems, a milestone originally targeted for 2028. Group-wide freshwater intake has fallen 31% against the 2019 baseline as a result.
The remaining two sites are scheduled for retrofit by the end of next year, which would bring the entire production network under the same standard.